General
Vaudreuil Fire Station
Design and install a high-performance ventilation system for a new fire station, with particular emphasis on managing the exhaust gases (CO and NO2) generated by the trucks. The project required the installation of appropriate technological equipment to ensure efficient air circulation and a healthy environment inside the building.
Client
Espace Construction
Début du projet
2022
Fin du projet
2024
Les défis du projet
Diffusair delivered a tailor-made system to meet the specific requirements of a fire station, guaranteeing flawless air quality despite the regular presence of heavy vehicles indoors. Thanks to rigorous planning and state-of-the-art equipment, the installation contributes to the safety and comfort of occupants.