Desjardins Mascouche

General

Desjardins Mascouche

Design and install the ventilation and control systems for a three-storey building used to centralize Desjardins’ operations. The project, which was the result of a call for tenders, presented major challenges, including an accelerated schedule and constant adjustments due to the pandemic situation.

Client

Groupe Montoni - Construction Division

Début du projet

2020

Fin du projet

2021

Les défis du projet

Using a collaborative design-build approach, we adapted our processes to meet tight deadlines while ensuring the quality of the installations. The building, designed to optimize comfort and efficiency, incorporates state-of-the-art centralized control and humidification systems.