General
Desjardins Mascouche
Design and install the ventilation and control systems for a three-storey building used to centralize Desjardins’ operations. The project, which was the result of a call for tenders, presented major challenges, including an accelerated schedule and constant adjustments due to the pandemic situation.
Client
Groupe Montoni - Construction Division
Début du projet
2020
Fin du projet
2021
Les défis du projet
Using a collaborative design-build approach, we adapted our processes to meet tight deadlines while ensuring the quality of the installations. The building, designed to optimize comfort and efficiency, incorporates state-of-the-art centralized control and humidification systems.