Carry out the renovation of the historic building in Phase 1, while meeting the challenges of adapting to existing conditions, in particular 50- to 55-foot-high ceilings. Phase 2 involved the design and construction of facilities adapted to the structural and aesthetic requirements of the building. The work required a careful approach to strengthening the building while preserving its unique character.

Client

CAL Construction (Phase 1) / Directly with the client (Phase 2)

Début du projet

2011

Fin du projet

2014

Les défis du projet

Since 2011, Diffusair has continued to serve the Arsenal Contemporary Art Museum with constant service, ensuring the performance of the installations. The work carried out in this historic building enabled us to comply with strict standards while guaranteeing a comfortable and functional environment tailored to its specific needs.