Clinique d’anesthésie AGM

Medical sector

Clinique d’anesthésie AGM

Design and install a high-tech ventilation and air quality control system for an anesthesia clinic, with a focus on HEPA filtration and humidification. The existing building presented technical challenges, requiring specific adaptations to the plans to meet the requirements of the operating room. The complex sequencing and programming system was designed to ensure critical air change and flawless air quality.

Client

Construction HUB / Huotco

Début du projet

2023

Fin du projet

2024

Les défis du projet

Diffusair provided a tailor-made solution to meet the needs of this specialist clinic, with remote monitoring and control of the systems to minimize travel. The client benefits from our ongoing service, ensuring the performance of the ventilation system and guaranteeing an efficient and compliant healthcare environment.